I will be doing energization studies involving underground cables inside a small solar PV plant. My question are as follows: 1. If the cable has a length of 20 feet, is it enough to model the cable as a PI-section or the frequency-dependent phase model is needed? 2. Is there a qualification on the length of cable that warrants cable energization and trapped charge studies?