Answer Question
660MW TRANSIENT STUDY
I have to carry out Transient stability study for 2X 660 MW Generating station, in compliance with Grid Code such as Grid Voltage and Frequency profile. The generator should also be able to run under houseload condition when grid is disconnected.
For such study I need to select proper parameters for Governor, Exciter and PSS.Can anyone please help me determine proper parameters for these.
If you require I can share with you Generator Data sheet, Grid Codes, and all other necessary inputs available.
THE GOVERNOR TYPE IS STM AS PER IEEE MODELS.
I am referring to HITACHI gen data sheet.
Please help me in carrying out Transient stability Study.
regards
Farhan Siddiqui
For such study I need to select proper parameters for Governor, Exciter and PSS.Can anyone please help me determine proper parameters for these.
If you require I can share with you Generator Data sheet, Grid Codes, and all other necessary inputs available.
THE GOVERNOR TYPE IS STM AS PER IEEE MODELS.
I am referring to HITACHI gen data sheet.
Please help me in carrying out Transient stability Study.
regards
Farhan Siddiqui