I have implemented a protection scheme using 3 phase breakers and timing logic to trigger when the breakers open and close. Is it possible to use the over-current detection block to trigger the breaker to operate when the fault current reaches a certain level? I have tried to do this but have had little success doing it.
Add New Comment